Take a walk around just about any part of campus, and you’ll find some sort of maintenance or construction in progress.
Tower Drive
One of the most noticeable projects is on Tower Drive. Near Williams Hall and the Life Sciences building, laborers work in a trench running most of the block. Large pipes sit exposed as workers move around in their various sized excavators.
-
A sign reads “Construction Area Do Not Cross” on Wednesday, Sept. 13, 2023, on Tower Drive in Baton Rouge, La.
'
-
A large wheel of tubing sits on Wednesday, Sept. 13, 2023, on Tower Drive in Baton Rouge, La.
'
-
A construction crew works in a trench on Wednesday, Sept. 13, 2023, on Tower Drive in Baton Rouge, La.
'
-
A hole sits exposed on Wednesday, Sept. 13, 2023, on Tower Drive in Baton Rouge, La.
'
-
A banner reads “Building Improved Air Conditioning Cool with you? #ScholarshipFirst” on Wednesday, Sept. 13, 2023, near Tower Drive in Baton Rouge, La.
'
Lighting
Throughout campus new lamps pop up every few days. Starting over the summer, these lamps began showing up as part of a project to improve lighting and safety on campus.
-
A cable spool sits under trees on Wednesday, Sept. 13, 2023, near the Horseshoe Community on LSU’s campus.
'
-
Wires sit exposed on the base of a new lamp on Wednesday, Sept. 13, 2023, on South Campus Drive in Baton Rouge, La.
'
-
Students walk past a new lamp on Wednesday, Sept. 13, 2023, near Allen Hall on LSU’s campus in Baton Rouge, La.
'
Others
Additionally, a few holes are present in the Quad, part of Field House Drive sends up dust as vehicles pass by because of a layer of gravel on the road and scaffolding remains around much of the Art and Design building.
-
Pipes sit exposed on Wednesday, Sept. 13, 2023, in the Quad on LSU’s campus in Baton Rouge, La.
'
-
A truck drives on rocks on Wednesday, Sept. 13, 2023, on Field House Drive on LSU’s campus in Baton Rouge, La.
'
-
Pavement meets gravel on Wednesday, Sept. 13, 2023, on Field House Drive on LSU’s campus in Baton Rouge, La.
'
-
Fencings surrounds much of the Art and Design Building on Wednesday, Sept. 13, 2023, on LSU’s campus in Baton Rouge, La.
'
-
Work continues near Tureaud Hall on Wednesday, Sept. 13, 2023, on Stadium Drive in Baton Rouge, La.
'
-
Materials sit near the Animal and Food Science Laboratory on Wednesday, Sept. 13, 2023, in Baton Rouge, La.
'
-
Wood boards lead to the entrance of the Animal and Food Science Laboratory on Wednesday, Sept. 13, 2023, on Forestry Lane in Baton Rouge, La.
'
-
A set of cooling towers sits in a parking lot on Wednesday, Sept. 13, 2023, near the Power House on Field House Drive on LSU’s campus in Baton Rouge, La.
'
-
Various construction supplies sits in a parking lot on Wednesday, Sept. 13, 2023, near the Power House on LSU’s campus in Baton Rouge, La.
'